Your GCC in India, built by people who build products.
We set up your Global Capability Center in Mohali, run it with you, and transfer it to you when you are ready. Design, AI and engineering talent from the first hire, not added later.
- Build-Operate-Transfer or managed
- Start small inside our Mohali campus
- Design and AI from day one
- Your team, your IP
design and engineering
delivered
India is where companies now build, not just support.
GCCs in India are no longer back offices. New ones are built around AI from the first day, and they own whole products for the global business.
These are figures for the India GCC market from published industry reports, not Intelligaia numbers. Read the reports: Nasscom and Zinnov, India GCC Landscape 2026 and EY GCC Pulse Survey 2025.
Why Mohali, and why us.
Most GCCs crowd into Bengaluru and Hyderabad, and fight over the same people. Mohali sits in the Chandigarh tricity, with engineering and design graduates coming out of the region every year and a calmer hiring market. We have built product teams here for years already, so your centre starts with a working studio, not an empty floor.
The centre and the craft, from one partner.
Most GCC partners stop at the building, the payroll and the headcount. We set those up too, and then we bring what makes a GCC worth having: people who can design, build and own a product.
The centre
- GCC plan, team shape and cost model
- Entity, registrations and compliance, with our legal and accounting partners
- Office space and IT, starting inside our campus
- Hiring, onboarding and payroll
- Day-to-day operations and reporting
The craft
- Product discovery and service blueprints
- A design centre of excellence and a shared design system
- AI and agentic workflows with human review
- Frontend and full-stack engineering
- Training your people until they run it
Your team can start here, on day one.
Our own building at Alpha IT City, Sector 83, Mohali. Desks, meeting rooms, IT and a team already at work, so your first hires walk into a working studio while your own office gets ready.









Pick how much you want to own, and when.
You can start with one model and move to another. Most companies start small and take ownership once the team is working.
Build-Operate-Transfer
We build the centre, run it on your behalf, and transfer the entity, the team and the IP to you at an agreed point.
Managed GCC
Your dedicated team works only for you, under your processes, while we handle the entity, payroll, office and operations.
GCC starter pod
A small dedicated pod inside our Mohali campus, a designer, AI engineers and a lead, that grows into your centre.
Plan it. Build and run it. Then it is yours.
One team from the first plan to the transfer, so nothing gets lost between a consultant, a recruiter and a vendor.
Agree the charter, the first roles and the numbers.
What work moves first, which roles to hire, the setup model and a cost range. It starts with the no-cost GCC plan.
Your team is hired and shipping.
We hire, onboard and run the centre. Our designers and AI engineers work inside your team from the first sprint, so the methods are set before the headcount grows.
The centre becomes yours.
Entity, people, design system, code and AI setup move to you. We stay on call while your site leader takes charge.
No India presence yet? Start with a starter pod in our campus and grow from there.
Already have a GCC? We add a design and AI practice to it, or take over a team to run and grow.
What leaders ask before they start a GCC.
Straight answers, before you have to write to us.
What is a Global Capability Center (GCC)?
How does Build-Operate-Transfer (BOT) work?
How long does it take to set up a GCC in India?
Why Mohali and not Bengaluru or Hyderabad?
What is the smallest team we can start with?
Who owns the team and the IP?
How do you keep our code and data safe?
We already have a GCC. Can you still help?
Start your GCC
with a plan.
A no-cost GCC plan for your company: team shape, setup model, cost range and timeline.